Terminal/ Wharf Control Buildings Case Study
Learn how we designed a terminal control building to be built on land, shipped to the sea, and dropped into place by boat.
Maritime safety regulations and requirements caused higher construction costs and extended time lines. SLA and its consultants developed an approach that would mitigate these hurdles by designing a building to be built off-site and shipped by barge to the final wharf, jetty location.