CA Multi-Purpose Building

The buildings designed modularity benefits of pre-manufactured structural elements, and a building sized to allow for future expansion, this design separates interior office staff from exterior plant personnel to help minimize cleaning/reduce wear and tear on the structure. Access for exterior persons is controlled through the design configuration, yet allows office/plant personnel to collaborate as required to optimize the plant functions.

Location

Canada

Building Stats

  • New Construction
  • Metal building structure
  • Specialized control room lighting
  • Fire protection systems
  • Administrative offices
  • Maintenance Shop
  • Tool Wicket / Warehouse
  • Emergency Medical Services
  • Locker Rooms
  • Open office work areas
  • Control Suite (DCcaS, Engineering, Control room, Rest Recovery, Team Conf Rooms)

Project Size

71,000 SF

Other project information withheld due to non-disclosure agreement with client.

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt